The scheme aims to promote renewable energy and reduce electricity expenses. Through this scheme, a 75% subsidy is provided for setting up solar plants (1KW to 40KW) in milk cooperative societies in tribal areas.

State In Kind

States / UT: Gujarat

Nodal department: Agriculture, Farmers Welfare and Cooperation Department

Scheme for: Individual

Scheme profile

DBT (direct benefit transfer): No

Categories: Agriculture,Rural & Environment

Sub-categories: Mechanization- solar power, farming systems

Target beneficiaries: Registered Societies

Tags: Agriculture, Solar Subsidy, Milk Cooperatives, Renewable Energy, Electricity Saving

Details

The "Scheme of Capital Assistance for Setting Up Solar Plants in Milk Cooperative Societies in the State of Gujarat (Tribal Areas)" by the Department of Agriculture, Farmers Welfare and Cooperation, Government of Gujarat aims to promote renewable energy and reduce electricity expenses. Through this scheme, a 75% subsidy is provided for setting up solar plants (1KW to 40KW) in milk cooperative societies in tribal areas.

Benefits

  • - Financial Assistance: 75% subsidy on capital cost for installation of solar systems ranging from 1KW to 40KW
  • Financial Assistance: 75% subsidy on capital cost for installation of solar systems ranging from 1KW to 40KW.


Eligibility

  • A registered milk cooperative society located in the tribal areas of Gujarat shall be eligible under this scheme.
  • The society must extensively use electricity for milk collection, cooling, and processing.
  • The society must be willing to install a solar power plant with a capacity between 1KW and 40KW.

How useful is this scheme?

Public benefit analysis

A practical look at this scheme for citizens

AI-generated insights showing how useful, accessible, and practical this scheme may be — combining deterministic scoring rules with a public-policy LLM analyst.

5.8
/ 10
Public Benefit Score
Accessibility 7.0/10 Good
Rural usefulness 7.0/10 Good
Application complexity 5.0/10 Moderate
Financial impact 5.0/10 Moderate
Literacy barrier 2.0/10 Good
Women inclusivity 4.0/10 Moderate
Awareness 4.5/10 Moderate
Implementation reliability 7.0/10 Good
Bigger shape means a better fit for citizens
  • Accessibility7.0
  • Financial impact5.0
  • Rural utility7.0
  • Awareness4.5
  • Simplicity5.0
  • Inclusivity4.0

What problem does this scheme solve?

The scheme provides significant support for renewable energy in milk cooperatives, particularly in tribal areas of Gujarat.

Key challenges addressed

  • High electricity costs for milk processing
  • Promotion of renewable energy sources

Most beneficial for

  • Registered milk cooperative societies in tribal areas

Likely challenges

  • Limited awareness among potential beneficiaries
  • Dependency on offline application process

Practical insights for citizens

The scheme is practical but requires better outreach and support.

Rural challenges

  • Limited access to information
  • Geographical barriers to District Registrar's office

Implementation bottlenecks

  • Need for physical submission of applications

Awareness challenges

  • Low awareness among rural cooperatives

Application analysis

Application mode
Offline office
Documents burden
Low
Verification complexity
Moderate
Office dependency
High
DBT dependency
No
CSC support
No
Estimated citizen effort
Moderate

Estimated beneficiary reach

  • Rural / urban reach High
  • Gender reach Moderate
  • Occupation reach Agriculture, Dairy

Benefit analysis

Benefit type
In Kind
Benefit frequency
One-time subsidy
Benefit practicality
High, as it significantly reduces installation costs
Financial meaningfulness
Very meaningful due to the 75% subsidy
Long-term impact
Positive impact on electricity savings and sustainability

Plain-language guidance

This scheme helps milk cooperatives in Gujarat's tribal areas set up solar plants with a 75% subsidy. It aims to reduce electricity costs and promote renewable energy.

Who should apply
Registered milk cooperative societies in tribal areas of Gujarat.
Who may struggle
Societies with limited knowledge of the application process.
Best application route
Apply directly at the District Registrar's office.

This intelligence section is generated by an AI policy analyst combined with rule-based scoring. Scores and narrative are estimates derived from the publicly available scheme information shown on this page; actual experience may vary by state, district, and department. Always confirm details on the official portal before you apply.

Application Process

Offline

Step 1: Collect the plain paper application form from the District Registrar's office.
Step 2: Fill in all required details in the application form and attach the necessary documents.
Step 3: Submit the completed application to the District Registrar.

Clarifications

Additional points from the scheme information published on myScheme (not legal advice).

What is the main purpose of the "Scheme of Capital Assistance for Setting Up Solar Plants in Milk Cooperative Societies in the State of Gujarat (Tribal Areas)"?

The main purpose of the scheme is to financially support milk cooperative societies in tribal areas by subsidizing the cost of setting up solar power plants, thereby promoting renewable energy and reducing operational electricity costs.

Who is eligible to apply for this scheme?

Only registered milk cooperative societies located in the tribal areas of Gujarat are eligible to apply for this scheme.

What type of financial assistance is provided under this scheme?

Under this scheme, eligible cooperative societies are provided a subsidy of 75% on the capital cost for setting up solar power plants with a capacity between 1KW and 40KW.

Which government department is responsible for implementing this scheme?

The Department of Agriculture, Farmers Welfare and Cooperation, Government of Gujarat, is responsible for implementing this scheme.

Where can an applicant obtain the application form for this scheme?

The application form for the scheme can be obtained from the office of the District Registrar.

Is there any fee charged for the application form?

No, there is no cost associated with obtaining the application form; it is available free of charge.

What is the permissible range of solar plant capacity under the scheme?

The scheme allows for the installation of solar power plants with a capacity ranging from 1 kilowatt (KW) to 40 kilowatts (KW).

Does the scheme cover the full cost of installing a solar plant?

No, the scheme covers only 75% of the capital cost; the remaining 25% must be borne by the cooperative society.

How should the completed application be submitted?

The completed application must be submitted on plain paper along with the required documents to the District Registrar.

Whom should applicants contact for more information or assistance regarding the scheme?

Applicants should contact the District Registrar office in their respective areas for detailed information, clarification, or assistance related to the scheme.

References

Guidelines (Scheme No. 103)
https://mariyojana.gujarat.gov.in/Schemeatoz.aspx
User Manual (Applicant Registration)
https://ikhedut.gujarat.gov.in/site/iKhedut%202.0%20User%20Manual%20PPT_Gujarati.pdf

Apply

Apply now

Opens the official application or programme portal in a new tab. If in doubt, confirm details on the ministry site.

Frequently asked questions

What is the purpose of Capital Subsidy Scheme for Setting Up Solar Plant in Milk Cooperatives in Gujarat State (Tribal Area)?
Capital Subsidy Scheme for Setting Up Solar Plant in Milk Cooperatives in Gujarat State (Tribal Area) is a government welfare initiative designed to support Individual, Registered Societies through benefits related to Agriculture,Rural & Environment, financial assistance, subsidies, social welfare, healthcare, education, or livelihood support.
Who can apply for Capital Subsidy Scheme for Setting Up Solar Plant in Milk Cooperatives in Gujarat State (Tribal Area)?
Eligibility for Capital Subsidy Scheme for Setting Up Solar Plant in Milk Cooperatives in Gujarat State (Tribal Area) may depend on factors such as income category, age, gender, occupation, state of residence, social category, and government-defined beneficiary criteria.
What benefits are offered under Capital Subsidy Scheme for Setting Up Solar Plant in Milk Cooperatives in Gujarat State (Tribal Area)?
Benefits under Capital Subsidy Scheme for Setting Up Solar Plant in Milk Cooperatives in Gujarat State (Tribal Area) may include financial assistance, subsidies, scholarships, insurance support, healthcare benefits, pension support, training assistance, or welfare services depending on the scheme guidelines.
Which department manages Capital Subsidy Scheme for Setting Up Solar Plant in Milk Cooperatives in Gujarat State (Tribal Area)?
Capital Subsidy Scheme for Setting Up Solar Plant in Milk Cooperatives in Gujarat State (Tribal Area) is managed by Agriculture, Farmers Welfare and Cooperation Department and may be implemented through district offices, online portals, CSC centres, banks, or authorised government agencies.
Can users apply online for Capital Subsidy Scheme for Setting Up Solar Plant in Milk Cooperatives in Gujarat State (Tribal Area)?
Yes, eligible applicants may be able to apply online for Capital Subsidy Scheme for Setting Up Solar Plant in Milk Cooperatives in Gujarat State (Tribal Area) through official government portals, authorised service centres, or digital application systems depending on the implementation process.
Is Aadhaar mandatory for Capital Subsidy Scheme for Setting Up Solar Plant in Milk Cooperatives in Gujarat State (Tribal Area)?
Many government schemes may require Aadhaar verification, identity proof, or linked bank account details for beneficiary validation and direct benefit transfer processing.
Where can users apply for Capital Subsidy Scheme for Setting Up Solar Plant in Milk Cooperatives in Gujarat State (Tribal Area)?
Applications for Capital Subsidy Scheme for Setting Up Solar Plant in Milk Cooperatives in Gujarat State (Tribal Area) may be submitted through government departments, official scheme portals, CSC centres, district offices, welfare departments, or authorised service centres.
What documents may be required for Capital Subsidy Scheme for Setting Up Solar Plant in Milk Cooperatives in Gujarat State (Tribal Area)?
Applicants may need Aadhaar card, income certificate, residence proof, bank account details, caste certificate, photographs, educational records, or occupation-related documents depending on scheme eligibility requirements.
Is income certificate required for Capital Subsidy Scheme for Setting Up Solar Plant in Milk Cooperatives in Gujarat State (Tribal Area)?
Income certificate requirements may vary depending on beneficiary category, subsidy eligibility, and financial assistance criteria defined under Capital Subsidy Scheme for Setting Up Solar Plant in Milk Cooperatives in Gujarat State (Tribal Area).
Is Capital Subsidy Scheme for Setting Up Solar Plant in Milk Cooperatives in Gujarat State (Tribal Area) available in all states?
No, Capital Subsidy Scheme for Setting Up Solar Plant in Milk Cooperatives in Gujarat State (Tribal Area) is primarily available for eligible residents of Gujarat and may be implemented through state government departments and local administrative offices.
Can residents outside Gujarat apply for Capital Subsidy Scheme for Setting Up Solar Plant in Milk Cooperatives in Gujarat State (Tribal Area)?
Eligibility for Capital Subsidy Scheme for Setting Up Solar Plant in Milk Cooperatives in Gujarat State (Tribal Area) is generally limited to residents of Gujarat unless otherwise specified in the official scheme guidelines.
Can small and marginal farmers apply for Capital Subsidy Scheme for Setting Up Solar Plant in Milk Cooperatives in Gujarat State (Tribal Area)?
Eligible small and marginal farmers may apply for Capital Subsidy Scheme for Setting Up Solar Plant in Milk Cooperatives in Gujarat State (Tribal Area) subject to land ownership records, income eligibility, and agricultural beneficiary criteria.
Does Capital Subsidy Scheme for Setting Up Solar Plant in Milk Cooperatives in Gujarat State (Tribal Area) provide subsidy support for farmers?
Capital Subsidy Scheme for Setting Up Solar Plant in Milk Cooperatives in Gujarat State (Tribal Area) may provide agricultural subsidies, financial assistance, crop support, irrigation benefits, insurance coverage, or farming-related welfare assistance depending on the scheme structure.
Can CSC centres help users apply for Capital Subsidy Scheme for Setting Up Solar Plant in Milk Cooperatives in Gujarat State (Tribal Area)?
Many government schemes may be accessible through nearby CSC centres, authorised digital service centres, or welfare facilitation offices.
How can users check the latest updates for Capital Subsidy Scheme for Setting Up Solar Plant in Milk Cooperatives in Gujarat State (Tribal Area)?
Users should verify official notifications, department announcements, application deadlines, and eligibility updates through authorised government portals or implementing agencies.
Can beneficiaries track application status for Capital Subsidy Scheme for Setting Up Solar Plant in Milk Cooperatives in Gujarat State (Tribal Area)?
Certain schemes may provide online application tracking, beneficiary verification systems, or status-check facilities through official portals.
Where can users get help for Capital Subsidy Scheme for Setting Up Solar Plant in Milk Cooperatives in Gujarat State (Tribal Area) in Gujarat?
Users in Gujarat may seek assistance through CSC centres, district welfare offices, government departments, agriculture offices, social welfare departments, or authorised facilitation centres.
Which nearby public services may help with Capital Subsidy Scheme for Setting Up Solar Plant in Milk Cooperatives in Gujarat State (Tribal Area) applications?
Depending on the scheme, users may require support from Aadhaar centres, CSC centres, banks, hospitals, post offices, or government welfare offices for document verification and application assistance.