[Work] open
AI summary
This tender provides details about the project including scope of work, estimated value, deadlines, and eligibility requirements.
Overview
This tender is issued by UP Power Transmission Corp. Ltd (Operation) for electrical work in Banda. The tender is categorized as an open tender, and it requires bidders to submit their proposals in a two-cover format.
Scope / Work
The work involves electrical tasks as specified in the tender documents. Bidders must comply with the pre-qualification criteria outlined in the documents. The contract will be awarded on a lump-sum basis, and the period of work is set for 30 days. Bidders should note that the bid validity is 90 days from the submission date.
Fees & EMD
- Tender Fee: ₹590, payable offline to EE ETD Banda. No exemption is allowed for the tender fee.
- EMD (Earnest Money Deposit): ₹1,500, also payable offline to EE ETD Banda. No exemption is allowed for the EMD.
Key dates
- Publish Date: 21-May-2026 12:00 PM
- Bid Submission Start Date: 21-May-2026 12:00 PM
- Bid Submission End Date: 05-Jun-2026 10:00 AM
- Bid Opening Date: 06-Jun-2026 11:00 AM
- Document Download Period: 21-May-2026 12:00 PM to 05-Jun-2026 10:00 AM
- Clarification Period: 21-May-2026 12:00 PM to 05-Jun-2026 10:00 AM
Bidders should ensure all documents are submitted within the specified timelines and comply with the requirements to avoid disqualification.
AI insights
Risk factors
- EMD size
- bid validity
- tight timelines
- no tender fee exemption
Financials
| Tender value | Undisclosed |
|---|---|
| EMD amount | ₹1,500 — payable to EE ETD Banda at EE ETD Banda |
| Tender fee | ₹590 — payable to EE ETD Banda at EE ETD Banda |
Payment mode Offline
Timeline
| Publish date | 21-May-2026 12:00 PM |
|---|---|
| Bid end | 05-Jun-2026 10:00 AM |
| Opening date | 06-Jun-2026 11:00 AM |
Critical dates
From the portal detail page (all dates captured when available).
| Bid Opening Date | 06-Jun-2026 11:00 AM |
|---|---|
| Bid Submission End Date | 05-Jun-2026 10:00 AM |
| Bid Submission Start Date | 21-May-2026 12:00 PM |
| Clarification End Date | 05-Jun-2026 10:00 AM |
| Clarification Start Date | 21-May-2026 12:00 PM |
| Document Download / Sale End Date | 05-Jun-2026 10:00 AM |
| Document Download / Sale Start Date | 21-May-2026 12:00 PM |
| Published Date | 21-May-2026 12:00 PM |
Tender Documents
Sign in and verify your email to use our viewer. You can open up to 5 different documents per UTC day (each file counts once). Archives (ZIP, RAR, etc.) are download only—no in-browser preview. Need a higher limit?
| Name | Size | Type | Action |
|---|---|---|---|
| BOQ_2156540.xls | 285 KB | XLS | |
| T-06B.pdf | 918.74 KB |
Work details
Location, category, and schedule for this procurement.
| Location | Banda |
|---|---|
| Category | Electrical Works |
| Period of work | 30 days |
| Bid validity | 90 days |
Tender basics
| Tender type | Open Tender |
|---|---|
| Form of contract | Lump-sum |
| Tender category | Works |
| No. of covers | 2 |
| Organisation chain | UP Power Transmission Corp.Ltd (Operation)||Chief Engineer (TSC) South Central Jhansi||SE ETC, Banda||EE, ETD, Banda |
| Source portal | etender.up.nic.in |
Covers (bid packets)
What to submit in each cover, as listed on the tender portal.
| Cover no. | Cover type | Description | Document type |
|---|---|---|---|
| 1 | Fee/PreQual/Technical | Fee/PreQual/Technical | |
| 2 | Finance | Finance | .xls |
Authority details
| Inviting authority | EE ETD Banda |
|---|---|
| Address | 220 KV Substation Tindwari Road Banda |
| Payment instruments | Offline (RTGS - RTGS Payment) |
Browse by tags
Jump to other tenders using these keywords.