[TNPGCL- Proposed comprehensive rehabilitation/ reconstruction and raising of NCTPS Ash Dyke Bund to cater the ash disposal needs of upcoming Ennore SEZ STPP (2x660MW) in addition to the existing NCTPS Stage-I, II and III- on EPC basis.] open
AI summary
This tender provides details about the project including scope of work, estimated value, deadlines, and eligibility requirements.
Overview
This tender is issued by TNEB Limited for the comprehensive rehabilitation, reconstruction, and raising of the NCTPS Ash Dyke Bund to accommodate the ash disposal needs of the upcoming Ennore SEZ STPP (2x660MW) alongside existing NCTPS stages I, II, and III. The contract will be executed on an EPC basis.
Scope / Work
The work involves civil engineering tasks related to the ash dyke bund, ensuring it meets the disposal requirements for the new power station. Bidders must refer to the tender documents for specific pre-qualification criteria and detailed work descriptions. A pre-bid meeting is scheduled for 25-Mar-2026 at the Chief Engineer's office in Chennai, which is an opportunity for bidders to clarify any doubts.
Fees & EMD
- Tender Fee: There is no tender fee associated with this bid.
- EMD: A fixed Earnest Money Deposit (EMD) of ₹90,000,000 is required, with exemptions allowed under certain conditions. Bidders should ensure compliance with EMD requirements to avoid disqualification.
Key Dates
- Tender Published: 13-Mar-2026
- Document Download: 13-Mar-2026 to 20-May-2026
- Clarification Period: 13-Mar-2026 to 31-Mar-2026
- Bid Submission: 14-May-2026 to 20-May-2026
- Bid Opening: 21-May-2026
Bidders are advised to adhere strictly to the timelines and ensure all required documents are submitted in the specified formats. The bid validity period is 90 days from the bid opening date.
AI insights
Risk factors
- high EMD amount
- strict bid validity period
- no tender fee
- tight submission timeline
Financials
| Tender value | Undisclosed |
|---|---|
| EMD amount | ₹9,00,00,000 — payable to Nil at Nil |
| Tender fee | ₹0.00 — payable to Nil at Nil |
Payment mode Online
Timeline
| Publish date | 13-Mar-2026 04:00 PM |
|---|---|
| Bid end | 20-May-2026 05:00 PM |
| Opening date | 21-May-2026 03:00 PM |
Documents available from 13-Mar-2026 04:00 PM to 20-May-2026 05:00 PM. Clarification window: 13-Mar-2026 04:00 PM to 31-Mar-2026 05:00 PM.
Tender Documents
Sign in and verify your email to use our viewer. You can open up to 5 different documents per UTC day (each file counts once). Archives (ZIP, RAR, etc.) are download only—no in-browser preview. Need a higher limit?
| Name | Size | Type | Action |
|---|---|---|---|
| BOQ_810627.xls | 344.5 KB | XLS | |
| VolumeICommercialSpecification.pdf | 1.80 MB | ||
| VolumeIITechnicalSpecification.pdf | 2.61 MB | ||
| CORRIGENDUM2.pdf | 138.18 KB | ||
| CorrigendumI.pdf | 214.98 KB |
Corrigenda
Official amendments and notices. PDFs open in the same viewer as tender documents (sign in, verified email, daily limit applies).
Bid Submission and Due date Extension
| File | Size | Type | Action |
|---|---|---|---|
| CORRIGENDUM2.pdf | 138.18 |
Prebid meeting Postponed
| File | Size | Type | Action |
|---|---|---|---|
| CorrigendumI.pdf | 214.98 |
Work details
Location, category, and schedule for this procurement.
| Location | Ennore SEZ STPP Voyalur |
|---|---|
| Category | Civil Works |
| Bid validity | 90 days |
Tender basics
| Tender type | Open Tender |
|---|---|
| Form of contract | Lump-sum |
| Tender category | Works |
| No. of covers | 2 |
| Organisation chain | TNEB Limited||TANGEDCO||CE-Projects - TANGEDCO |
| Source portal | tntenders.gov.in |
Authority details
| Inviting authority | Chief Engineer /Projects |
|---|---|
| Address | Chief Engineer /Projects, 5th Floor, Western Wing, NPKRR Maligai, 144, Anna Salai, Chennai - 600 002 |
| Payment instruments | Online |
Browse by tags
Jump to other tenders using these keywords.