The Department of Power is inviting bids for the extension of the Switch House Building at the 66 KV Sub Station Lakha. This is an open tender aimed at civil works, with a total tender value of ₹28,16,514. The tender is structured as a percentage contract, and bidders should be aware that it requires submission in three covers.

Scope / Work

The work involves the extension of the Switch House Building at the specified substation. Bidders should prepare to meet the technical requirements as outlined in the detailed notice. The period of work is set for 240 days, and bids must remain valid for 120 days from the submission date.

Fees & EMD

Bidders are required to pay a tender fee of ₹1,180 and an Earnest Money Deposit (EMD) of ₹56,330, which is 2% of the tender value. Both payments must be made online, and no exemptions for fees or EMD are allowed. Ensure that all documents related to the tender fee and EMD are submitted in the first cover as specified.

Key dates

  • Tender Publish Date: 03-Feb-2025 04:00 PM
  • Bid Submission Start Date: 03-Feb-2025 04:00 PM
  • Bid Submission End Date: 27-Apr-2026 11:00 AM
  • Bid Opening Date: 28-Apr-2026 03:00 PM

Bidders should download the tender documents between the publish date and the bid submission end date. It is crucial to adhere to these timelines to ensure compliance and eligibility.

AI insights

Risk factors

  • EMD size
  • bid validity
  • tight timelines
  • document submission requirements

Financials

Tender value ₹28,16,514
EMD amount ₹56,330 — payable to Nil at Nil
Tender fee ₹1,180 — payable to Nil at Nil

Payment mode Online

Timeline

Publish date 03-Feb-2025 04:00 PM
Bid end 27-Apr-2026 11:00 AM
Opening date 28-Apr-2026 03:00 PM

Documents available from 03-Feb-2025 04:00 PM to 27-Apr-2026 11:00 AM.

Tender Documents

How tender documents work

Sign in and verify your email to use our viewer. You can open up to 5 different documents per UTC day (each file counts once). Archives (ZIP, RAR, etc.) are download only—no in-browser preview. Need a higher limit?

Name Size Type Action
BOQ_271450.xls 258 KB XLS
View document Sign-in required
DNITLAKHA.pdf 1.32 MB PDF
View document Sign-in required
CORR58LAKHA.pdf 340.55 KB PDF
View document Sign-in required
CORR57LAKHA.pdf 407.26 KB PDF
View document Sign-in required
CORR56LAKHA.pdf 181.87 KB PDF
View document Sign-in required
CORR55LAKHA.pdf 54.59 KB PDF
View document Sign-in required
CORR54LAKHA.pdf 315.55 KB PDF
View document Sign-in required
CORR53LAKHA.pdf 536.59 KB PDF
View document Sign-in required
CORR52LAKHA.pdf 55.28 KB PDF
View document Sign-in required
CORR51LAKHA.pdf 153.41 KB PDF
View document Sign-in required
CORR50LAKHA.pdf 184.85 KB PDF
View document Sign-in required
CORR49LAKHA.pdf 333.1 KB PDF
View document Sign-in required
CORR48LAKHA.pdf 222.57 KB PDF
View document Sign-in required
CORR47LAKHA.pdf 128.95 KB PDF
View document Sign-in required
CORR46LAKHA.pdf 301.05 KB PDF
View document Sign-in required
CORR45LAKHA.pdf 513.51 KB PDF
View document Sign-in required
CORR44LAKHA.pdf 224.67 KB PDF
View document Sign-in required
CORR43LAKHA.pdf 214.03 KB PDF
View document Sign-in required
CORR42LK.pdf 270.14 KB PDF
View document Sign-in required
CORR41LAKHA.pdf 292.17 KB PDF
View document Sign-in required
CORR40LAKHA.pdf 291.84 KB PDF
View document Sign-in required
COOR39LAKHA.pdf 603.4 KB PDF
View document Sign-in required
CORR38LAKHA.pdf 88.74 KB PDF
View document Sign-in required
CORR37LAKHA.pdf 455.08 KB PDF
View document Sign-in required
CORR36LAKHA.pdf 287.99 KB PDF
View document Sign-in required
CORR35LAKHA.pdf 350.08 KB PDF
View document Sign-in required
CORR34LAKHA.pdf 467.29 KB PDF
View document Sign-in required
CORR33LAKHA.pdf 134.19 KB PDF
View document Sign-in required
CORR32LAKHA.pdf 417.31 KB PDF
View document Sign-in required
CORR31LAKHA.pdf 493.44 KB PDF
View document Sign-in required
CORR30LAKHA.pdf 418.34 KB PDF
View document Sign-in required
CORR29LAKHA.pdf 81.48 KB PDF
View document Sign-in required
CORR28LAKHA.pdf 409.21 KB PDF
View document Sign-in required
CORR27LAKHA.pdf 224.78 KB PDF
View document Sign-in required
CORR26LAKHA.pdf 478.01 KB PDF
View document Sign-in required
CORR25LAKHA.pdf 253.68 KB PDF
View document Sign-in required
CORR24LAKHA.pdf 380.21 KB PDF
View document Sign-in required
CORR23LAKHA.pdf 160.8 KB PDF
View document Sign-in required
CORR22LAKHA.pdf 132.62 KB PDF
View document Sign-in required
CORR21LAKHA.pdf 522.48 KB PDF
View document Sign-in required
CORR20LAKHA.pdf 542.31 KB PDF
View document Sign-in required
CORR19LAKHA.pdf 554.52 KB PDF
View document Sign-in required
CORR18LAKHA.pdf 622.44 KB PDF
View document Sign-in required
CORR17LAKHA.pdf 331.08 KB PDF
View document Sign-in required
CORR16LAKHA.pdf 125.58 KB PDF
View document Sign-in required
CORR15LAKHA.pdf 322.76 KB PDF
View document Sign-in required
CORR14LAKHA.pdf 534.27 KB PDF
View document Sign-in required
CORR13LAKHA.pdf 405.57 KB PDF
View document Sign-in required
CORR12LAKHA.pdf 210.19 KB PDF
View document Sign-in required
CORR11LAKHA.pdf 193.14 KB PDF
View document Sign-in required
CORR10LAKHA.pdf 384.63 KB PDF
View document Sign-in required
CORR9LAKHA.pdf 382.33 KB PDF
View document Sign-in required
CORR8LAKHA.pdf 108.23 KB PDF
View document Sign-in required
CORR7LAKHA.pdf 652.87 KB PDF
View document Sign-in required
CORR6LAKHA.pdf 935.78 KB PDF
View document Sign-in required
CORR5LAKHA.pdf 944.98 KB PDF
View document Sign-in required
CORR4LAKHA.pdf 715.07 KB PDF
View document Sign-in required
CORR3LAKHA.pdf 984.23 KB PDF
View document Sign-in required
CORR2LAKHA.pdf 834.56 KB PDF
View document Sign-in required
CORR1LAKHA.pdf 805.97 KB PDF
View document Sign-in required

Corrigenda

Official amendments and notices. PDFs open in the same viewer as tender documents (sign in, verified email, daily limit applies).

CORRIGENDUM NO.58

Type Date

Published Corrigendum Details Date : 20-Apr-2026 09:51 PM [Tender information] Organisation Chain : Department of Power||Punjab State Power Corporation Limited||CE - P and M||P and M Civil Construction and Mtc. - Ludhiana Tender ID : 2025_POWER_133960_1 Tender Ref No : 45/CCM/LDH/2024-25 Tender Title : Extension of Switch House Building at 66 KV Sub Station Lakha Corrigendum Type : Date [Corrigendum:58] Corrigendum title: CORRIGENDUM NO.58 Description: Extension of Switch House Building at 66 KV Sub Station Lakha Published: 20-Apr-2026 02:17 PM Document: CORR58LAKHA.pdf Size (KB): 340.55 Publish Date: 03-Feb-2025 04:00 PM │ Bid Opening Date: 28-Apr-2026 03:00 PM Document Download/Sale Start Date: 03-Feb-2025 04:00 PM │ Document Download/Sale End Date: 27-Apr-2026 11:00 AM Clarification Start Date: NA │ Clarification End Date: NA Bid Submission Start Date: 03-Feb-2025 04:00 PM │ Bid Submission End Date: 27-Apr-2026 11:00 AM [Critical Dates] [Corrigendum:57] Publish Date: 03-Feb-2025 04:00 PM │ Bid Opening Date: 21-Apr-2026 03:00 PM Document Download/Sale Start Date: 03-Feb-2025 04:00 PM │ Document Download/Sale End Date: 20-Apr-2026 11:00 AM Clarification Start Date: NA │ Clarification End Date: NA Bid Submission Start Date: 03-Feb-2025 04:00 PM │ Bid Submission End Date: 20-Apr-2026 11:00 AM [Critical Dates] [Corrigendum:56] Publish Date: 03-Feb-2025 04:00 PM │ Bid Opening Date: 16-Apr-2026 03:00 PM Document Download/Sale Start Date: 03-Feb-2025 04:00 PM │ Document Download/Sale End Date: 15-Apr-2026 11:00 AM Clarification Start Date: NA │ Clarification End Date: NA Bid Submission Start Date: 03-Feb-2025 04:00 PM │ Bid Submission End Date: 15-Apr-2026 11:00 AM [Critical Dates] [Corrigendum:55] Publish Date: 03-Feb-2025 04:00 PM │ Bid Opening Date: 09-Apr-2026 03:00 PM Document Download/Sale Start Date: 03-Feb-2025 04:00 PM │ Document Download/Sale End Date: 07-Apr-2026 11:00 AM Clarification Start Date: NA │ Clarification End Date: NA Bid Submission Start Date: 03-Feb-2025 04:00 PM │ Bid Submission End Date: 07-Apr-2026 11:00 AM [Critical Dates] [Corrigendum:54] Publish Date: 03-Feb-2025 04:00 PM │ Bid Opening Date: 02-Apr-2026 03:00 PM Document Download/Sale Start Date: 03-Feb-2025 04:00 PM │ Document Download/Sale End Date: 01-Apr-2026 11:00 AM Clarification Start Date: NA │ Clarification End Date: NA Bid Submission Start Date: 03-Feb-2025 04:00 PM │ Bid Submission End Date: 01-Apr-2026 11:00 AM [Critical Dates] [Corrigendum:53] Publish Date: 03-Feb-2025 04:00 PM │ Bid Opening Date: 25-Mar-2026 03:00 PM Document Download/Sale Start Date: 03-Feb-2025 04:00 PM │ Document Download/Sale End Date: 24-Mar-2026 11:00 AM Clarification Start Date: NA │ Clarification End Date: NA Bid Submission Start Date: 03-Feb-2025 04:00 PM │ Bid Submission End Date: 24-Mar-2026 11:00 AM [Critical Dates] [Corrigendum:52] Publish Date: 03-Feb-2025 04:00 PM │ Bid Opening Date: 18-Mar-2026 03:00 PM Document Download/Sale Start Date: 03-Feb-2025 04:00 PM │ Document Download/Sale End Date: 17-Mar-2026 11:00 AM Clarification Start Date: NA │ Clarification End Date: NA Bid Submission Start Date: 03-Feb-2025 04:00 PM │ Bid Submission End Date: 17-Mar-2026 11:00 AM [Critical Dates] [Corrigendum:51] Publish Date: 03-Feb-2025 04:00 PM │ Bid Opening Date: 11-Mar-2026 03:00 PM Document Download/Sale Start Date: 03-Feb-2025 04:00 PM │ Document Download/Sale End Date: 10-Mar-2026 11:00 AM Clarification Start Date: NA │ Clarification End Date: NA Bid Submission Start Date: 03-Feb-2025 04:00 PM │ Bid Submission End Date: 10-Mar-2026 11:00 AM [Critical Dates] [Corrigendum:50] Publish Date: 03-Feb-2025 04:00 PM │ Bid Opening Date: 03-Mar-2026 03:00 PM Document Download/Sale Start Date: 03-Feb-2025 04:00 PM │ Document Download/Sale End Date: 02-Mar-2026 11:00 AM Clarification Start Date: NA │ Clarification End Date: NA Bid Submission Start Date: 03-Feb-2025 04:00 PM │ Bid Submission End Date: 02-Mar-2026 11:00 AM [Critical Dates] [Corrigendum:49] Publish Date: 03-Feb-2025 04:00 PM │ Bid Opening Date: 23-Feb-2026 03:00 PM Document Download/Sale Start Date: 03-Feb-2025 04:00 PM │ Document Download/Sale End Date: 20-Feb-2026 11:00 AM Clarification Start Date: NA │ Clarification End Date: NA Bid Submission Start Date: 03-Feb-2025 04:00 PM │ Bid Submission End Date: 20-Feb-2026 11:00 AM [Critical Dates] [Corrigendum:48] Publish Date: 03-Feb-2025 04:00 PM │ Bid Opening Date: 16-Feb-2026 03:00 PM Document Download/Sale Start Date: 03-Feb-2025 04:00 PM │ Document Download/Sale End Date: 13-Feb-2026 11:00 AM Clarification Start Date: NA │ Clarification End Date: NA Bid Submission Start Date: 03-Feb-2025 04:00 PM │ Bid Submission End Date: 13-Feb-2026 11:00 AM [Critical Dates] [Corrigendum:47] Publish Date: 03-Feb-2025 04:00 PM │ Bid Opening Date: 09-Feb-2026 03:00 PM Document Download/Sale Start Date: 03-Feb-2025 04:00 PM │ Document Download/Sale End Date: 06-Feb-2026 11:00 AM Clarification Start Date: NA │ Clarification End Date: NA Bid Submission Start Date: 03-Feb-2025 04:00 PM │ Bid Submission End Date: 06-Feb-2026 11:00 AM [Critical Dates] [Corrigendum:46] Publish Date: 03-Feb-2025 04:00 PM │ Bid Opening Date: 02-Feb-2026 03:00 PM Document Download/Sale Start Date: 03-Feb-2025 04:00 PM │ Document Download/Sale End Date: 30-Jan-2026 11:00 AM Clarification Start Date: NA │ Clarification End Date: NA Bid Submission Start Date: 03-Feb-2025 04:00 PM │ Bid Submission End Date: 30-Jan-2026 11:00 AM [Critical Dates] [Corrigendum:45] Publish Date: 03-Feb-2025 04:00 PM │ Bid Opening Date: 27-Jan-2026 03:00 PM Document Download/Sale Start Date: 03-Feb-2025 04:00 PM │ Document Download/Sale End Date: 23-Jan-2026 11:00 AM Clarification Start Date: NA │ Clarification End Date: NA Bid Submission Start Date: 03-Feb-2025 04:00 PM │ Bid Submission End Date: 23-Jan-2026 11:00 AM [Critical Dates] [Corrigendum:44] Publish Date: 03-Feb-2025 04:00 PM │ Bid Opening Date: 19-Jan-2026 03:00 PM Document Download/Sale Start Date: 03-Feb-2025 04:00 PM │ Document Download/Sale End Date: 16-Jan-2026 11:00 AM Clarification Start Date: NA │ Clarification End Date: NA Bid Submission Start Date: 03-Feb-2025 04:00 PM │ Bid Submission End Date: 16-Jan-2026 11:00 AM [Critical Dates] [Corrigendum:43] Publish Date: 03-Feb-2025 04:00 PM │ Bid Opening Date: 12-Jan-2026 03:00 PM Document Download/Sale Start Date: 03-Feb-2025 04:00 PM │ Document Download/Sale End Date: 09-Jan-2026 11:00 AM Clarification Start Date: NA │ Clarification End Date: NA Bid Submission Start Date: 03-Feb-2025 04:00 PM │ Bid Submission End Date: 09-Jan-2026 11:00 AM [Critical Dates] [Corrigendum:42] Publish Date: 03-Feb-2025 04:00 PM │ Bid Opening Date: 05-Jan-2026 03:00 PM Document Download/Sale Start Date: 03-Feb-2025 04:00 PM │ Document Download/Sale End Date: 02-Jan-2026 11:00 AM Clarification Start Date: NA │ Clarification End Date: NA Bid Submission Start Date: 03-Feb-2025 04:00 PM │ Bid Submission End Date: 02-Jan-2026 11:00 AM [Critical Dates] [Corrigendum:41] Publish Date: 03-Feb-2025 04:00 PM │ Bid Opening Date: 29-Dec-2025 03:00 PM Document Download/Sale Start Date: 03-Feb-2025 04:00 PM │ Document Download/Sale End Date: 26-Dec-2025 11:00 AM Clarification Start Date: NA │ Clarification End Date: NA Bid Submission Start Date: 03-Feb-2025 04:00 PM │ Bid Submission End Date: 26-Dec-2025 11:00 AM [Critical Dates] [Corrigendum:40] Publish Date: 03-Feb-2025 04:00 PM │ Bid Opening Date: 19-Dec-2025 03:00 PM Document Download/Sale Start Date: 03-Feb-2025 04:00 PM │ Document Download/Sale End Date: 18-Dec-2025 11:00 AM Clarification Start Date: NA │ Clarification End Date: NA Bid Submission Start Date: 03-Feb-2025 04:00 PM │ Bid Submission End Date: 18-Dec-2025 11:00 AM [Critical Dates] [Corrigendum:39] Publish Date: 03-Feb-2025 04:00 PM │ Bid Opening Date: 12-Dec-2025 03:00 PM Document Download/Sale Start Date: 03-Feb-2025 04:00 PM │ Document Download/Sale End Date: 11-Dec-2025 11:00 AM Clarification Start Date: NA │ Clarification End Date: NA Bid Submission Start Date: 03-Feb-2025 04:00 PM │ Bid Submission End Date: 11-Dec-2025 11:00 AM [Critical Dates] [Corrigendum:38] Publish Date: 03-Feb-2025 04:00 PM │ Bid Opening Date: 05-Dec-2025 03:00 PM Document Download/Sale Start Date: 03-Feb-2025 04:00 PM │ Document Download/Sale End Date: 04-Dec-2025 11:00 AM Clarification Start Date: NA │ Clarification End Date: NA Bid Submission Start Date: 03-Feb-2025 04:00 PM │ Bid Submission End Date: 04-Dec-2025 11:00 AM [Critical Dates] [Corrigendum:37] Publish Date: 03-Feb-2025 04:00 PM │ Bid Opening Date: 28-Nov-2025 03:00 PM Document Download/Sale Start Date: 03-Feb-2025 04:00 PM │ Document Download/Sale End Date: 27-Nov-2025 11:00 AM Clarification Start Date: NA │ Clarification End Date: NA Bid Submission Start Date: 03-Feb-2025 04:00 PM │ Bid Submission End Date: 27-Nov-2025 11:00 AM [Critical Dates] [Corrigendum:36] Publish Date: 03-Feb-2025 04:00 PM │ Bid Opening Date: 21-Nov-2025 03:00 PM Document Download/Sale Start Date: 03-Feb-2025 04:00 PM │ Document Download/Sale End Date: 20-Nov-2025 11:00 AM Clarification Start Date: NA │ Clarification End Date: NA Bid Submission Start Date: 03-Feb-2025 04:00 PM │ Bid Submission End Date: 20-Nov-2025 11:00 AM [Critical Dates] [Corrigendum:35] Publish Date: 03-Feb-2025 04:00 PM │ Bid Opening Date: 14-Nov-2025 03:00 PM Document Download/Sale Start Date: 03-Feb-2025 04:00 PM │ Document Download/Sale End Date: 13-Nov-2025 11:00 AM Clarification Start Date: NA │ Clarification End Date: NA Bid Submission Start Date: 03-Feb-2025 04:00 PM │ Bid Submission End Date: 13-Nov-2025 11:00 AM [Critical Dates] [Corrigendum:34] Publish Date: 03-Feb-2025 04:00 PM │ Bid Opening Date: 07-Nov-2025 03:00 PM Document Download/Sale Start Date: 03-Feb-2025 04:00 PM │ Document Download/Sale End Date: 06-Nov-2025 11:00 AM Clarification Start Date: NA │ Clarification End Date: NA Bid Submission Start Date: 03-Feb-2025 04:00 PM │ Bid Submission End Date: 06-Nov-2025 11:00 AM [Critical Dates] [Corrigendum:33] Publish Date: 03-Feb-2025 04:00 PM │ Bid Opening Date: 31-Oct-2025 03:00 PM Document Download/Sale Start Date: 03-Feb-2025 04:00 PM │ Document Download/Sale End Date: 30-Oct-2025 11:00 AM Clarification Start Date: NA │ Clarification End Date: NA Bid Submission Start Date: 03-Feb-2025 04:00 PM │ Bid Submission End Date: 30-Oct-2025 11:00 AM [Critical Dates] [Corrigendum:32] Publish Date: 03-Feb-2025 04:00 PM │ Bid Opening Date: 24-Oct-2025 03:00 PM Document Download/Sale Start Date: 03-Feb-2025 04:00 PM │ Document Download/Sale End Date: 23-Oct-2025 11:00 AM Clarification Start Date: NA │ Clarification End Date: NA Bid Submission Start Date: 03-Feb-2025 04:00 PM │ Bid Submission End Date: 23-Oct-2025 11:00 AM [Critical Dates] [Corrigendum:31] Publish Date: 03-Feb-2025 04:00 PM │ Bid Opening Date: 17-Oct-2025 03:00 PM Document Download/Sale Start Date: 03-Feb-2025 04:00 PM │ Document Download/Sale End Date: 16-Oct-2025 11:00 AM Clarification Start Date: NA │ Clarification End Date: NA Bid Submission Start Date: 03-Feb-2025 04:00 PM │ Bid Submission End Date: 16-Oct-2025 11:00 AM [Critical Dates] [Corrigendum:30] Publish Date: 03-Feb-2025 04:00 PM │ Bid Opening Date: 10-Oct-2025 03:00 PM Document Download/Sale Start Date: 03-Feb-2025 04:00 PM │ Document Download/Sale End Date: 08-Oct-2025 11:00 AM Clarification Start Date: NA │ Clarification End Date: NA Bid Submission Start Date: 03-Feb-2025 04:00 PM │ Bid Submission End Date: 08-Oct-2025 11:00 AM [Critical Dates] [Corrigendum:29] Publish Date: 03-Feb-2025 04:00 PM │ Bid Opening Date: 03-Oct-2025 03:00 PM Document Download/Sale Start Date: 03-Feb-2025 04:00 PM │ Document Download/Sale End Date: 01-Oct-2025 11:00 AM Clarification Start Date: NA │ Clarification End Date: NA Bid Submission Start Date: 03-Feb-2025 04:00 PM │ Bid Submission End Date: 01-Oct-2025 11:00 AM [Critical Dates] [Corrigendum:28] Publish Date: 03-Feb-2025 04:00 PM │ Bid Opening Date: 25-Sep-2025 03:00 PM Document Download/Sale Start Date: 03-Feb-2025 04:00 PM │ Document Download/Sale End Date: 23-Sep-2025 11:00 AM Clarification Start Date: NA │ Clarification End Date: NA Bid Submission Start Date: 03-Feb-2025 04:00 PM │ Bid Submission End Date: 23-Sep-2025 11:00 AM [Critical Dates] [Corrigendum:27] Publish Date: 03-Feb-2025 04:00 PM │ Bid Opening Date: 16-Sep-2025 03:00 PM Document Download/Sale Start Date: 03-Feb-2025 04:00 PM │ Document Download/Sale End Date: 12-Sep-2025 11:00 AM Clarification Start Date: NA │ Clarification End Date: NA Bid Submission Start Date: 03-Feb-2025 04:00 PM │ Bid Submission End Date: 12-Sep-2025 11:00 AM [Critical Dates] [Corrigendum:26] Publish Date: 03-Feb-2025 04:00 PM │ Bid Opening Date: 09-Sep-2025 03:00 PM Document Download/Sale Start Date: 03-Feb-2025 04:00 PM │ Document Download/Sale End Date: 05-Sep-2025 11:00 AM Clarification Start Date: NA │ Clarification End Date: NA Bid Submission Start Date: 03-Feb-2025 04:00 PM │ Bid Submission End Date: 05-Sep-2025 11:00 AM [Critical Dates] [Corrigendum:25] Publish Date: 03-Feb-2025 04:00 PM │ Bid Opening Date: 01-Sep-2025 03:00 PM Document Download/Sale Start Date: 03-Feb-2025 04:00 PM │ Document Download/Sale End Date: 28-Aug-2025 11:00 AM Clarification Start Date: NA │ Clarification End Date: NA Bid Submission Start Date: 03-Feb-2025 04:00 PM │ Bid Submission End Date: 28-Aug-2025 11:00 AM [Critical Dates] [Corrigendum:24] Publish Date: 03-Feb-2025 04:00 PM │ Bid Opening Date: 25-Aug-2025 03:00 PM Document Download/Sale Start Date: 03-Feb-2025 04:00 PM │ Document Download/Sale End Date: 21-Aug-2025 11:00 AM Clarification Start Date: NA │ Clarification End Date: NA Bid Submission Start Date: 03-Feb-2025 04:00 PM │ Bid Submission End Date: 21-Aug-2025 11:00 AM [Critical Dates] [Corrigendum:23] Publish Date: 03-Feb-2025 04:00 PM │ Bid Opening Date: 18-Aug-2025 03:00 PM Document Download/Sale Start Date: 03-Feb-2025 04:00 PM │ Document Download/Sale End Date: 14-Aug-2025 11:00 AM Clarification Start Date: NA │ Clarification End Date: NA Bid Submission Start Date: 03-Feb-2025 04:00 PM │ Bid Submission End Date: 14-Aug-2025 11:00 AM [Critical Dates] [Corrigendum:22] Publish Date: 03-Feb-2025 04:00 PM │ Bid Opening Date: 08-Aug-2025 03:00 PM Document Download/Sale Start Date: 03-Feb-2025 04:00 PM │ Document Download/Sale End Date: 06-Aug-2025 11:00 AM Clarification Start Date: NA │ Clarification End Date: NA Bid Submission Start Date: 03-Feb-2025 04:00 PM │ Bid Submission End Date: 06-Aug-2025 11:00 AM [Critical Dates] [Corrigendum:21] Publish Date: 03-Feb-2025 04:00 PM │ Bid Opening Date: 31-Jul-2025 03:00 PM Document Download/Sale Start Date: 03-Feb-2025 04:00 PM │ Document Download/Sale End Date: 29-Jul-2025 11:00 AM Clarification Start Date: NA │ Clarification End Date: NA Bid Submission Start Date: 03-Feb-2025 04:00 PM │ Bid Submission End Date: 29-Jul-2025 11:00 AM [Critical Dates] [Corrigendum:20] Publish Date: 03-Feb-2025 04:00 PM │ Bid Opening Date: 24-Jul-2025 03:00 PM Document Download/Sale Start Date: 03-Feb-2025 04:00 PM │ Document Download/Sale End Date: 22-Jul-2025 11:00 AM Clarification Start Date: NA │ Clarification End Date: NA Bid Submission Start Date: 03-Feb-2025 04:00 PM │ Bid Submission End Date: 22-Jul-2025 11:00 AM [Critical Dates] [Corrigendum:19] Publish Date: 03-Feb-2025 04:00 PM │ Bid Opening Date: 17-Jul-2025 03:00 PM Document Download/Sale Start Date: 03-Feb-2025 04:00 PM │ Document Download/Sale End Date: 15-Jul-2025 11:00 AM Clarification Start Date: NA │ Clarification End Date: NA Bid Submission Start Date: 03-Feb-2025 04:00 PM │ Bid Submission End Date: 15-Jul-2025 11:00 AM [Critical Dates] [Corrigendum:18] Publish Date: 03-Feb-2025 04:00 PM │ Bid Opening Date: 10-Jul-2025 03:00 PM Document Download/Sale Start Date: 03-Feb-2025 04:00 PM │ Document Download/Sale End Date: 08-Jul-2025 11:00 AM Clarification Start Date: NA │ Clarification End Date: NA Bid Submission Start Date: 03-Feb-2025 04:00 PM │ Bid Submission End Date: 08-Jul-2025 11:00 AM [Critical Dates] [Corrigendum:17] Publish Date: 03-Feb-2025 04:00 PM │ Bid Opening Date: 03-Jul-2025 03:00 PM Document Download/Sale Start Date: 03-Feb-2025 04:00 PM │ Document Download/Sale End Date: 01-Jul-2025 11:00 AM Clarification Start Date: NA │ Clarification End Date: NA Bid Submission Start Date: 03-Feb-2025 04:00 PM │ Bid Submission End Date: 01-Jul-2025 11:00 AM [Critical Dates] [Corrigendum:16] Publish Date: 03-Feb-2025 04:00 PM │ Bid Opening Date: 26-Jun-2025 03:00 PM Document Download/Sale Start Date: 03-Feb-2025 04:00 PM │ Document Download/Sale End Date: 24-Jun-2025 11:00 AM Clarification Start Date: NA │ Clarification End Date: NA Bid Submission Start Date: 03-Feb-2025 04:00 PM │ Bid Submission End Date: 24-Jun-2025 11:00 AM [Critical Dates] [Corrigendum:15] Publish Date: 03-Feb-2025 04:00 PM │ Bid Opening Date: 19-Jun-2025 03:00 PM Document Download/Sale Start Date: 03-Feb-2025 04:00 PM │ Document Download/Sale End Date: 17-Jun-2025 11:00 AM Clarification Start Date: NA │ Clarification End Date: NA Bid Submission Start Date: 03-Feb-2025 04:00 PM │ Bid Submission End Date: 17-Jun-2025 11:00 AM [Critical Dates] [Corrigendum:14] Publish Date: 03-Feb-2025 04:00 PM │ Bid Opening Date: 12-Jun-2025 03:00 PM Document Download/Sale Start Date: 03-Feb-2025 04:00 PM │ Document Download/Sale End Date: 10-Jun-2025 11:00 AM Clarification Start Date: NA │ Clarification End Date: NA Bid Submission Start Date: 03-Feb-2025 04:00 PM │ Bid Submission End Date: 10-Jun-2025 11:00 AM [Critical Dates] [Corrigendum:13] Publish Date: 03-Feb-2025 04:00 PM │ Bid Opening Date: 05-Jun-2025 03:00 PM Document Download/Sale Start Date: 03-Feb-2025 04:00 PM │ Document Download/Sale End Date: 03-Jun-2025 11:00 AM Clarification Start Date: NA │ Clarification End Date: NA Bid Submission Start Date: 03-Feb-2025 04:00 PM │ Bid Submission End Date: 03-Jun-2025 11:00 AM [Critical Dates] [Corrigendum:12] Publish Date: 03-Feb-2025 04:00 PM │ Bid Opening Date: 29-May-2025 03:00 PM Document Download/Sale Start Date: 03-Feb-2025 04:00 PM │ Document Download/Sale End Date: 27-May-2025 11:00 AM Clarification Start Date: NA │ Clarification End Date: NA Bid Submission Start Date: 03-Feb-2025 04:00 PM │ Bid Submission End Date: 27-May-2025 11:00 AM [Critical Dates] [Corrigendum:11] Publish Date: 03-Feb-2025 04:00 PM │ Bid Opening Date: 22-May-2025 03:00 PM Document Download/Sale Start Date: 03-Feb-2025 04:00 PM │ Document Download/Sale End Date: 20-May-2025 11:00 AM Clarification Start Date: NA │ Clarification End Date: NA Bid Submission Start Date: 03-Feb-2025 04:00 PM │ Bid Submission End Date: 20-May-2025 11:00 AM [Critical Dates] [Corrigendum:10] Publish Date: 03-Feb-2025 04:00 PM │ Bid Opening Date: 15-May-2025 03:00 PM Document Download/Sale Start Date: 03-Feb-2025 04:00 PM │ Document Download/Sale End Date: 13-May-2025 11:00 AM Clarification Start Date: NA │ Clarification End Date: NA Bid Submission Start Date: 03-Feb-2025 04:00 PM │ Bid Submission End Date: 13-May-2025 11:00 AM [Critical Dates] [Corrigendum:9] Publish Date: 03-Feb-2025 04:00 PM │ Bid Opening Date: 07-May-2025 03:00 PM Document Download/Sale Start Date: 03-Feb-2025 04:00 PM │ Document Download/Sale End Date: 05-May-2025 11:00 AM Clarification Start Date: NA │ Clarification End Date: NA Bid Submission Start Date: 03-Feb-2025 04:00 PM │ Bid Submission End Date: 05-May-2025 11:00 AM [Critical Dates] [Corrigendum:8] Publish Date: 03-Feb-2025 04:00 PM │ Bid Opening Date: 02-May-2025 03:00 PM Document Download/Sale Start Date: 03-Feb-2025 04:00 PM │ Document Download/Sale End Date: 28-Apr-2025 11:00 AM Clarification Start Date: NA │ Clarification End Date: NA Bid Submission Start Date: 03-Feb-2025 04:00 PM │ Bid Submission End Date: 28-Apr-2025 11:00 AM [Critical Dates] [Corrigendum:7] Publish Date: 03-Feb-2025 04:00 PM │ Bid Opening Date: 23-Apr-2025 03:00 PM Document Download/Sale Start Date: 03-Feb-2025 04:00 PM │ Document Download/Sale End Date: 21-Apr-2025 11:00 AM Clarification Start Date: NA │ Clarification End Date: NA Bid Submission Start Date: 03-Feb-2025 04:00 PM │ Bid Submission End Date: 21-Apr-2025 11:00 AM [Critical Dates] [Corrigendum:6] Publish Date: 03-Feb-2025 04:00 PM │ Bid Opening Date: 11-Apr-2025 03:00 PM Document Download/Sale Start Date: 03-Feb-2025 04:00 PM │ Document Download/Sale End Date: 09-Apr-2025 11:00 AM Clarification Start Date: NA │ Clarification End Date: NA Bid Submission Start Date: 03-Feb-2025 04:00 PM │ Bid Submission End Date: 09-Apr-2025 11:00 AM [Critical Dates] [Corrigendum:5] Publish Date: 03-Feb-2025 04:00 PM │ Bid Opening Date: 03-Apr-2025 03:00 PM Document Download/Sale Start Date: 03-Feb-2025 04:00 PM │ Document Download/Sale End Date: 01-Apr-2025 11:00 AM Clarification Start Date: NA │ Clarification End Date: NA Bid Submission Start Date: 03-Feb-2025 04:00 PM │ Bid Submission End Date: 01-Apr-2025 11:00 AM [Critical Dates] [Corrigendum:4] Publish Date: 03-Feb-2025 04:00 PM │ Bid Opening Date: 27-Mar-2025 03:00 PM Document Download/Sale Start Date: 03-Feb-2025 04:00 PM │ Document Download/Sale End Date: 25-Mar-2025 11:00 AM Clarification Start Date: NA │ Clarification End Date: NA Bid Submission Start Date: 03-Feb-2025 04:00 PM │ Bid Submission End Date: 25-Mar-2025 11:00 AM [Critical Dates] [Corrigendum:3] Publish Date: 03-Feb-2025 04:00 PM │ Bid Opening Date: 19-Mar-2025 03:00 PM Document Download/Sale Start Date: 03-Feb-2025 04:00 PM │ Document Download/Sale End Date: 17-Mar-2025 11:00 AM Clarification Start Date: NA │ Clarification End Date: NA Bid Submission Start Date: 03-Feb-2025 04:00 PM │ Bid Submission End Date: 17-Mar-2025 11:00 AM [Critical Dates] [Corrigendum:2] Publish Date: 03-Feb-2025 04:00 PM │ Bid Opening Date: 12-Mar-2025 03:00 PM Document Download/Sale Start Date: 03-Feb-2025 04:00 PM │ Document Download/Sale End Date: 10-Mar-2025 11:00 AM Clarification Start Date: NA │ Clarification End Date: NA Bid Submission Start Date: 03-Feb-2025 04:00 PM │ Bid Submission End Date: 10-Mar-2025 11:00 AM [Critical Dates] [Corrigendum:1] Publish Date: 03-Feb-2025 04:00 PM │ Bid Opening Date: 27-Feb-2025 03:00 PM Document Download/Sale Start Date: 03-Feb-2025 04:00 PM │ Document Download/Sale End Date: 24-Feb-2025 11:00 AM Clarification Start Date: NA │ Clarification End Date: NA Bid Submission Start Date: 03-Feb-2025 04:00 PM │ Bid Submission End Date: 24-Feb-2025 11:00 AM [Critical Dates] [Details Before Corrigendum] Publish Date: 03-Feb-2025 04:00 PM │ Bid Opening Date: 19-Feb-2025 03:00 PM Document Download/Sale Start Date: 03-Feb-2025 04:00 PM │ Document Download/Sale End Date: 17-Feb-2025 11:00 AM Clarification Start Date: NA │ Clarification End Date: NA Bid Submission Start Date: 03-Feb-2025 04:00 PM │ Bid Submission End Date: 17-Feb-2025 11:00 AM [Critical Dates]
File Size Type Action
CORR58LAKHA.pdf 340.55 PDF
View document Sign-in required
CORR57LAKHA.pdf 407.26 PDF
View document Sign-in required
CORR56LAKHA.pdf 181.87 PDF
View document Sign-in required
CORR55LAKHA.pdf 54.59 PDF
View document Sign-in required
CORR54LAKHA.pdf 315.55 PDF
View document Sign-in required
CORR53LAKHA.pdf 536.59 PDF
View document Sign-in required
CORR52LAKHA.pdf 55.28 PDF
View document Sign-in required
CORR51LAKHA.pdf 153.41 PDF
View document Sign-in required
CORR50LAKHA.pdf 184.85 PDF
View document Sign-in required
CORR49LAKHA.pdf 333.1 PDF
View document Sign-in required
CORR48LAKHA.pdf 222.57 PDF
View document Sign-in required
CORR47LAKHA.pdf 128.95 PDF
View document Sign-in required
CORR46LAKHA.pdf 301.05 PDF
View document Sign-in required
CORR45LAKHA.pdf 513.51 PDF
View document Sign-in required
CORR44LAKHA.pdf 224.67 PDF
View document Sign-in required
CORR43LAKHA.pdf 214.03 PDF
View document Sign-in required
CORR42LK.pdf 270.14 PDF
View document Sign-in required
CORR41LAKHA.pdf 292.17 PDF
View document Sign-in required
CORR40LAKHA.pdf 291.84 PDF
View document Sign-in required
COOR39LAKHA.pdf 603.4 PDF
View document Sign-in required
CORR38LAKHA.pdf 88.74 PDF
View document Sign-in required
CORR37LAKHA.pdf 455.08 PDF
View document Sign-in required
CORR36LAKHA.pdf 287.99 PDF
View document Sign-in required
CORR35LAKHA.pdf 350.08 PDF
View document Sign-in required
CORR34LAKHA.pdf 467.29 PDF
View document Sign-in required
CORR33LAKHA.pdf 134.19 PDF
View document Sign-in required
CORR32LAKHA.pdf 417.31 PDF
View document Sign-in required
CORR31LAKHA.pdf 493.44 PDF
View document Sign-in required
CORR30LAKHA.pdf 418.34 PDF
View document Sign-in required
CORR29LAKHA.pdf 81.48 PDF
View document Sign-in required
CORR28LAKHA.pdf 409.21 PDF
View document Sign-in required
CORR27LAKHA.pdf 224.78 PDF
View document Sign-in required
CORR26LAKHA.pdf 478.01 PDF
View document Sign-in required
CORR25LAKHA.pdf 253.68 PDF
View document Sign-in required
CORR24LAKHA.pdf 380.21 PDF
View document Sign-in required
CORR23LAKHA.pdf 160.8 PDF
View document Sign-in required
CORR22LAKHA.pdf 132.62 PDF
View document Sign-in required
CORR21LAKHA.pdf 522.48 PDF
View document Sign-in required
CORR20LAKHA.pdf 542.31 PDF
View document Sign-in required
CORR19LAKHA.pdf 554.52 PDF
View document Sign-in required
CORR18LAKHA.pdf 622.44 PDF
View document Sign-in required
CORR17LAKHA.pdf 331.08 PDF
View document Sign-in required
CORR16LAKHA.pdf 125.58 PDF
View document Sign-in required
CORR15LAKHA.pdf 322.76 PDF
View document Sign-in required
CORR14LAKHA.pdf 534.27 PDF
View document Sign-in required
CORR13LAKHA.pdf 405.57 PDF
View document Sign-in required
CORR12LAKHA.pdf 210.19 PDF
View document Sign-in required
CORR11LAKHA.pdf 193.14 PDF
View document Sign-in required
CORR10LAKHA.pdf 384.63 PDF
View document Sign-in required
CORR9LAKHA.pdf 382.33 PDF
View document Sign-in required
CORR8LAKHA.pdf 108.23 PDF
View document Sign-in required
CORR7LAKHA.pdf 652.87 PDF
View document Sign-in required
CORR6LAKHA.pdf 935.78 PDF
View document Sign-in required
CORR5LAKHA.pdf 944.98 PDF
View document Sign-in required
CORR4LAKHA.pdf 715.07 PDF
View document Sign-in required
CORR3LAKHA.pdf 984.23 PDF
View document Sign-in required
CORR2LAKHA.pdf 834.56 PDF
View document Sign-in required
CORR1LAKHA.pdf 805.97 PDF
View document Sign-in required

Work details

Location, category, and schedule for this procurement.

Location Civil Const and Mtc Division Ludhiana
Category Civil Works - Others
Period of work 240 days
Bid validity 120 days

Tender basics

Tender type Open Tender
Form of contract Percentage
Tender category Works
No. of covers 3
Organisation chain Department of Power||Punjab State Power Corporation Limited||CE - P and M||P and M Civil Construction and Mtc. - Ludhiana
Source portal eproc.punjab.gov.in

Covers (bid packets)

What to submit in each cover, as listed on the tender portal.

Cover no. Cover type Description Document type
1 Fee TENDER FEES AND EMD THROUGH ONLINE .pdf
2 PreQual/Technical ALL TECHNICAL DOCUMENTS AS PER DNIT .pdf
3 Finance BOQ .xls

Authority details

Inviting authority Sr XEN Civil Const and Mtc Division Ludhiana
Address Sr XEN Civil Const and Mtc Division Power Colony No.1 Ludhiana
Payment instruments Online

Browse by tags

Jump to other tenders using these keywords.