[Diversion of 132 KV Bansi-Mehdawal S/C Transmission line between location No. 51 to 58 under Electricity Transmission Division-II, Basti H.Q. at Siddharthnagar] open

UP Power Transmission Corp.Ltd (Operation)

Ref: VERY SHORT TERM E-TENDER NO. 11/ETC(B)/2026-27 · ID: 2026_UPTCL_1148289_1

Value: ₹47,43,810

Category Electrical Works

AI summary

This tender provides details about the project including scope of work, estimated value, deadlines, and eligibility requirements.

Overview

This tender is issued by UP Power Transmission Corp. Ltd (Operation) for the diversion of the 132 KV Bansi-Mehdawal S/C Transmission line between location No. 51 to 58. The project falls under the Electricity Transmission Division-II, Basti H.Q. at Siddharthnagar.

Scope / Work

The work involves the diversion of the specified transmission line, which is categorized under Electrical Works. The total tender value is ₹47,43,810, and the contract type is a lump-sum tender. Bidders should note that the period of work is set for 30 days, and the bid validity is 180 days. The work location is at 220KV S/S GIDAHI, BASTI.

Fees & EMD

Bidders are required to pay a tender fee of ₹1,770, which is non-exemptible. Additionally, an Earnest Money Deposit (EMD) of ₹47,500 is mandatory, also non-exemptible. Payments can be made offline through various instruments including Demand Draft, Bank Guarantee, Fixed Deposit, or RTGS.

Key dates

  • Publish Date: 14-May-2026 01:00 PM
  • Bid Submission Start Date: 14-May-2026 01:00 PM
  • Bid Submission End Date: 25-May-2026 01:00 PM
  • Bid Opening Date: 26-May-2026 01:00 PM
  • Document Download Start Date: 14-May-2026 01:00 PM
  • Document Download End Date: 25-May-2026 01:00 PM

Bidders should ensure timely submission of documents and adherence to the specified timelines to avoid disqualification.

AI insights

Risk factors

  • non-exemptible EMD
  • non-exemptible tender fee
  • 180 days bid validity
  • tight submission timeline

Financials

Tender value ₹47,43,810
EMD amount ₹47,500 — payable to UPSEB Electricity Transmission Divn. at BASTI
Tender fee ₹1,770 — payable to UPSEB Electricity Transmission Divn. at BASTI

Payment mode Offline

Timeline

Publish date 14-May-2026 01:00 PM
Bid end 25-May-2026 01:00 PM
Opening date 26-May-2026 01:00 PM

Critical dates

From the portal detail page (all dates captured when available).

Bid Opening Date 26-May-2026 01:00 PM
Bid Submission End Date 25-May-2026 01:00 PM
Bid Submission Start Date 14-May-2026 01:00 PM
Document Download / Sale End Date 25-May-2026 01:00 PM
Document Download / Sale Start Date 14-May-2026 01:00 PM
Published Date 14-May-2026 01:00 PM

Tender Documents

How tender documents work

Sign in and verify your email to use our viewer. You can open up to 5 different documents per UTC day (each file counts once). Archives (ZIP, RAR, etc.) are download only—no in-browser preview. Need a higher limit?

Name Size Type Action
BOQ_2149330.xls 273.5 KB XLS
View document Sign-in required
TECHNICAL11.pdf 5.41 MB PDF
View document Sign-in required
Corrigendum_11_1st.pdf 321.77 KB PDF
View document Sign-in required

Corrigenda

Official amendments and notices. PDFs open in the same viewer as tender documents (sign in, verified email, daily limit applies).

Extension of Date

Type Date

Published Corrigendum Details Date : 23-May-2026 02:53 PM [Tender information] Organisation Chain : UP Power Transmission Corp.Ltd (Operation)||Chief Engineer (TNE) North-East Gorakhpur||S.E., ETC, Basti Tender ID : 2026_UPTCL_1148289_1 Tender Ref No : VERY SHORT TERM E-TENDER NO. 11/ETC(B)/2026-27 Tender Title : Diversion of 132 KV Bansi-Mehdawal S/C Transmission line between location No. 51 to 58 under Electricity Transmission Division-II, Basti H.Q. at Siddharthnagar Corrigendum Type : Date [Corrigendum:1] Corrigendum title: Extension of Date Description: Extension of Date Published: 20-May-2026 05:39 PM Document: Corrigendum_11_1st.pdf Size (KB): 321.77 Publish Date: 14-May-2026 01:00 PM │ Bid Opening Date: 26-May-2026 01:00 PM Document Download/Sale Start Date: 14-May-2026 01:00 PM │ Document Download/Sale End Date: 25-May-2026 01:00 PM Clarification Start Date: NA │ Clarification End Date: NA Bid Submission Start Date: 14-May-2026 01:00 PM │ Bid Submission End Date: 25-May-2026 01:00 PM [Critical Dates] [Details Before Corrigendum] Publish Date: 14-May-2026 01:00 PM │ Bid Opening Date: 21-May-2026 01:00 PM Document Download/Sale Start Date: 14-May-2026 01:00 PM │ Document Download/Sale End Date: 20-May-2026 01:00 PM Clarification Start Date: NA │ Clarification End Date: NA Bid Submission Start Date: 14-May-2026 01:00 PM │ Bid Submission End Date: 20-May-2026 01:00 PM [Critical Dates]
File Size Type Action
Corrigendum_11_1st.pdf 321.77 PDF
View document Sign-in required

Work details

Location, category, and schedule for this procurement.

Location 220KV S/S GIDAHI, BASTI
Category Electrical Works
Period of work 30 days
Bid validity 180 days

Tender basics

Tender type Open Tender
Form of contract Lump-sum
Tender category Works
No. of covers 2
Organisation chain UP Power Transmission Corp.Ltd (Operation)||Chief Engineer (TNE) North-East Gorakhpur||S.E., ETC, Basti
Source portal etender.up.nic.in

Covers (bid packets)

What to submit in each cover, as listed on the tender portal.

Cover no. Cover type Description Document type
1 Fee/PreQual/Technical TECHNICAL .pdf
2 Finance BOQ .xls

Authority details

Inviting authority SUPERINTENDING ENGINEER
Address OFFICE OF THE SUPERINTENDING ENGINEER, ELECTRICITY TRANSMISSION CIRCLE, 220KV S/S, GIDAHI, BASTI